C60 Bridge

C60 Bridge

This railway temporary bridge was developed to sustain the tracks and allow trains traffic during Jacking operations underneath. It is a single span bridge that is grounded on dedicated foundations that are calculated at each single application.

It has been used in Spain for the National Railway authority (ADIF) since 2006 and his application is compatible as well with different gauges, both International and Spanish one.

Further technical details can be downloaded below.