Railway crossing reconstruction – Lentvaris, Lithuania

Date 20/05/2021
Place Lentvaris, Lithuania
Customer TILSTA
Underpass dimension Base: 15.40 m, Height: 8.25 m, Length: 70.00 m (2 segments) // Weight: Segment 1: 3850 ton; Segment 2: 3410 ton
Pushing methodology Temporary bridges
Pushing Lenght 28.00 m
Description Reconstruction of Lentvaris railway crossing and construction of the tunnel in regional road n° 4707. The project consisted in jacking an underpass divided in two segments under active railroad using Verona System and special Verona System patented by Petrucco.