Evergreen Line LRT – Vancouver, Canada

Date 06/05/2013
Place Burnaby, Vancouver (BC), Canada
Customer SNC LAVALIN
Underpass dimension Base: 15.30m, Height: 7.30 m, Length: 51.00 m. Weight: 4300 ton
Pushing methodology Open air excavation
Description Box jacking to construct the station of the Evergreen Line LRT. The box jacking solution squeezed the duration of the interference with the road from several months to one long weekend.