Realizzazioni

Port Credit GO Station underpass for the Hurontario LRT (Hazel McCallion Line) in Mississauga, Canada. Box Jacking of a 5675 metric tons monolithic underpass with two cells configuration. To ensure the passenger and freight train traffic during the operations, nº3 active tracks were reinforced with 33m of Temporary Bridges each. A total of 99 lineal meters of Verona bridges ensured the circulation in all stages.
In the future, the underpass at Port Credit station will host 2 High Rail Tracks within, as part of the new Hurontario HLRT line from Mississauga to Brampton.

Port Credit Go Station
Mississauga, Canada

Scopri
Stazione di Ancona, intervento urgente di messa in sicurezza di un attraversamento idraulico. Il lavoro consiste nel montaggio del Ponte Verona in campata unica di luce 7.80 m su binario 4 con binario 3 interrotto per demolizione voltino sotto binario 3 e costruzione della nuova soletta in c.a.- Spostamento Ponte Verona da binario 4 a binario 2 per demolizione del voltino sotto binario 1. Il cronoprogramma prevede il montaggio del ponte sul binario 4 a partire dal 24 gennaio 2022 ed il completamento dei lavori entro due mesi.

Intervento di messa in sicurezza
Stazione di Ancona, Italia

Scopri

Ponte Verona
Valdaora, Italia

Scopri