Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line.
Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.

Sostituzione tombini
Vedelago (TV), Italia

Descrizione

Sostituzione tombini al km 42+974 e km 45+903 della linea Treviso – Castelfranco Veneto.

Spinta tombini prefabbricati con metodologia a spinta oleodinamica (Box Jacking) e sostegno binari con Sistema Verona. I tombini sono stati realizzati a conci in c.a. prefabbricati e sono stati eseguiti ognuno in 7 giorni lavorativi.

Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line. Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.
Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line. Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.