Box Jacking operation of a 5020-ton concrete box in just 55 hours below the QEW in Mississauga, Canada. The “push box” was jacked with the open pit methodology using hydraulic jacks. The box was installed to form the new QEW underpass for the Hurontario light rail transit (LRT) line that will run from south Mississauga to Brampton.

Paso inferior QEW, Hurontario LRT
Mississauga, Canada

Descubre
The Belfast Road Underpass was constructed using the Box Jacking technology. The Via Rail north track was kept active for train traffic by the installation of a temporary bridge that held the track during the push of the Box underneath it.
The Box was jacked at a temperature of 
-25°C (-13°F). The jacking of the Belfast Underpass is part of the Ottawa Light Rail Transit project and specifically is part of the Maintenance and Storage Facility Access.

Paso inferior en Belfast Road
Ottawa, Canadá

Descubre
Evergreen line LRT

Evergreen line LRT
Vancouver, Canada