Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line.
Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.

Sustitución de alcantarillas,
Vedelago (TV), Italia

Descripción

Sustitución de alcantarillas en el km 42+974 y km 45+903 de la línea Treviso – Castelfranco Veneto.

Empuje de alcantarillas prefabricadas con metodología de empuje oleodinámico (Box Jacking) y soporte de vía con Sistema Verona. Las alcantarillas fueron hechas con segmentos prefabricados de hormigón armado y cada una se completó en 7 días laborables.

Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line. Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.
Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line. Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.