A large concrete box being box jacked under tracks, construction vehicles, and workers wearing yellow helmets visible around the site, set against a backdrop of green hills and trees.

Box Jacking and track stiffening
Rosora (AN), Italy

Description

Hydraulic Box Jacking and track stiffening in Rosora (AN).

Executive design and construction of the works for the removal of the level crossing at km 251+698 of the Orte – Falconara railway line in the municipality of Rosora, through the construction of a road and pedestrian underpass at km 251+537 and the related connecting roads.

A concrete box structure being pushed under stiffened tracks by Petrucco, by box jacking technology. Jobsite in Rosora, Italy
Railway construction site with workers in safety gear; tracks are partially dismantled and stiffened by blue verona bridges by Petrucco; concrete box structure is visible beside the rails, about to be pushed under the stiffened railway. Trees, hills, and construction equipment are in the background under a clear sky.