Underpass tunnel in Craiova. Construction workers in safety gear work around a large concrete tunnel entrance, with machinery, pipes, and blue equipment on a dirt construction site under a partly cloudy sky.

Underpass Box Jacking
Craiova, Romania

Description

Underpass Box jacking in Craiova, Romania. Works related to the tender in Romania “Centura Ocolire Craiova – Southern Bypass Variant DN56 –DN55 –DN6”.

Box jacking of a monolithic concrete structure, 51.55 m long, with a cross section 12.40 m wide and 9.65 m high, weighing 4,050 tonnes, beneath the temporary CFR G18 bridge.

Client: SPIC SRL

Box Jacking underpass in Craiova. The picture shows a construction site with a large concrete underpass structure, surrounded by dirt roads, construction materials, and machinery under a cloudy sky. Workers and equipment are visible near the entrance of the structure.
Underpass constructed in Craiova. A paved road passes through a concrete underpass beneath a highway in a rural area, with dirt and sparse vegetation on either side and a clear blue sky above.