Bridge lifting operations over the Serchio at Migliarino Pisano, at km 105+826 of the Tirrenica line. Lifting of 4 metal beams of maximum 100 tons to allow the maintenance of support equipment on the Serchio bridge at km 105+826, Migliarino Pisano (PI). Work done in 3 weekends.

Bridge lifting
Migliarino Pisano (PI), Italy

Description

Bridge lifting operations over the Serchio river at Migliarino Pisano, at km 105+826 of the Tirrenica line.

Lifting of 4 metal beams of maximum 100 tons to allow the maintenance of support equipment on the Serchio bridge at km 105+826, Migliarino Pisano (PI).

Work done in 3 weekends.

Bridge lifting operations over the Serchio river - Migliarino Pisano (PI), Italy