Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line. Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.

Replacement of manholes
Vedelago (TV), Italy

Description

Replacement of manholes at km 42+974 and km 45+903 of the Treviso – Castelfranco Veneto line.

Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.

Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line. Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.
Replacement of manholes at km 42+974 and km 45+903 of the Treviso - Castelfranco Veneto line. Box-push of prefabricated manholes with hydraulic push-box methodology (Box Jacking) and track support with Verona System. The manholes were made of prefabricated concrete segments and each was completed in 7 working days.