Port Credit GO Station underpass for the Hurontario LRT (Hazel McCallion Line) in Mississauga, Canada. Box Jacking of a 5675 metric tons monolithic underpass with two cells configuration. To ensure the passenger and freight train traffic during the operations, nº3 active tracks were reinforced with 33m of Temporary Bridges each. A total of 99 lineal meters of Verona bridges ensured the circulation in all stages. In the future, the underpass at Port Credit station will host 2 High Rail Tracks within, as part of the new Hurontario HLRT line from Mississauga to Brampton.

Port Credit GO Station
Mississauga, Canada

Description

Port Credit GO Station underpass for the Hurontario LRT (Hazel McCallion Line) in Mississauga, Canada.

Box Jacking of a 5675 metric tons monolithic underpass with two cells configuration. To ensure the passenger and freight train traffic during the operations, nº3 active tracks were reinforced with 33m of Temporary Bridges each. A total of 99 lineal meters of Verona bridges ensured the circulation in all stages.
In the future, the underpass at Port Credit station will host 2 High Rail Tracks within, as part of the new Hurontario HLRT line from Mississauga to Brampton.

Port Credit GO Station underpass for the Hurontario LRT (Hazel McCallion Line) in Mississauga, Canada. Box Jacking of a 5675 metric tons monolithic underpass with two cells configuration. To ensure the passenger and freight train traffic during the operations, nº3 active tracks were reinforced with 33m of Temporary Bridges each. A total of 99 lineal meters of Verona bridges ensured the circulation in all stages. In the future, the underpass at Port Credit station will host 2 High Rail Tracks within, as part of the new Hurontario HLRT line from Mississauga to Brampton.
PETRUCCO Temporary railway bridges in Port Credit GO Station underpass for the Hurontario LRT (Hazel McCallion Line) in Mississauga, Canada. Box Jacking of a 5675 metric tons monolithic underpass with two cells configuration. To ensure the passenger and freight train traffic during the operations, nº3 active tracks were reinforced with 33m of Temporary Bridges each. A total of 99 lineal meters of Verona bridges ensured the circulation in all stages. In the future, the underpass at Port Credit station will host 2 High Rail Tracks within, as part of the new Hurontario HLRT line from Mississauga to Brampton.